Norman Forward Future Projects

Griffin Park

Original Vision Current Funding Improvements Pending 
  • Full-size indoor soccer facility
  • 14 new soccer fields
  • Level and grading of all fields
  • Site and field lighting for all fields
  • Additional parking, restrooms, concessions, and other site amenities
  • Support local leagues and host state and regional tournaments 
  • Regrading all fields
  • 14 new soccer fields
  • Additional parking
  • Additional restroom and site amenities

 

  • Full-size indoor soccer facility 
  • Expanded parking improvements
  • Additional field lighting

The Griffin Park project is not included on the GO Norman 2020 ballot, but $21.8 million would be available and added to the project budget from existing Norman FORWARD funds if Proposition 1 is approved. Griffin Park fields would be available for use for youth soccer programs.

On the GO 2020 Ballot

Multi-sport/Aquatic Center

Original Vision Current Funding
  • 152,000-sq.ft.
  • 25-yard x 50-meter pool
  • Six (6) lane x 25-yard warmup pool
  • Eight (8) basketball courts
  • 87,250-sq.ft.
  • 25-meter x 25-yard pool
  • Four (4)-lane x 25-yard warm up pool
  • Four (4) basketball courts

 

With current funding only a portion of the original vision of the project can be built. Additional funding provided through the proposed GO Norman 2020 bond would ensure the complete original vision is built to meet the needs of the community.

Senior Wellness Center

The design for the Senior Wellness Center is also underway lead by consultants from FSB. Several workshops/meetings have been held and a survey was done to collect input from residents.

Original Vision Current Funding
  • 27,200-sq.ft.
  • Warm-water pool 
  • Gym and fitness rooms
  • Catering kitchen
  • Multiple rooms for programs
  • Walking track
  • 18,500-sq.ft.
  • Walking track
  • Multi-purpose room

 

With current funding only a portion of the original vision of the project can be built. Additional funding provided through the proposed GO Norman 2020 bond would ensure the complete original vision is built to meet the needs of the community.

Softball & Football Complex

Original Vision Current Funding
  • State-of-the-art facilities
  • Five (5) field complex supporting local adult softball leagues and hosting state and regional tournaments
  • Seven (7) youth football practice fields 
  • Restroom and concession facility
  • Parking for participants and spectators
  • One (1) softball field
  • One (1) football field
  • Restroom and Concession Facility 
  • Parking for participants and spectators

 

With current funding only a portion of the original vision of the project can be built. Additional funding provided through the proposed GO Norman 2020 bond would ensure the complete original vision is built to meet the needs of the community.

Reaves Park

Original Vision Current Funding
  • (4) new fields: 8-16U Softball
  • (2) new fields: 13-14U Baseball
  • (4) reconstructed fields: 9-12U Baseball
  • (4) new fields: 5-8U Baseball
  • (14) total fields
  • New drive and portion of originally proposed parking
  • Renovation of ten (10) existing fields
  • Construction of four (4) new fields (5-8U)

 

With current funding only a portion of the original vision of the project can be built. Additional funding provided through the proposed GO Norman 2020 bond would ensure the complete original vision is built to meet the needs of the community.

Park Maintenance Facility

Original Vision

  • 15,900-sq.ft. program
  • Ten (10) service bays
  • Administrative offices

Additional funding will allow for the original vision of the project to be completed

With current funding only a portion of the original vision of the project can be built. Additional funding provided through the proposed GO Norman 2020 bond would ensure the complete original vision is built to meet the needs of the community.